SITE WORK AND SCHEDULED INSPECTIONS
Recent Experience Case Study

Lufkin LM6000 gearbox overhaul
Teesside Power Station, UK

Project background

Teesside power station, situated in Teesside, UK is the world’s largest combined heat & power plant with a total output of 1875 MW. Main power is provided by 8 x large Westinghouse gas turbines. The plant began operation in April 1993, and is operated by PX Power. This plant provides 4% of the total requirements of the UK.

On the site there is one ‘black start’ GE LM6000 gas turbine generator set. This unit operates at 38 MW. It utilised a Lufkin speed decreasing gearbox rated at 3600 rpm input to 3000 rpm output.

The black start gas turbine is used to provide additional power to the national grid as and when required.

The challenge and outcome

This unit had been in operation for 7 years with no maintenance having taken place during this period.

The operator was concerned that the unit needed an overhaul, and had scheduled a 10 day period to carry out a full inspection.

As no information was forwarded from the OEM manufacturer, PX Power chose Allen Gears who provided good support and were responsive to their queries.

In order to satisfy the requirement for swift completion of the gearbox inspection, Allen Gears sent two field service engineers to site who worked 24 hours a day (each operating a 12 hour shift) in order to complete the job as quickly as possible.

A full inspection was carried out as follows:

  • Removal of gear rotors and bearings
  • Clean and inspection of all components in detail including teeth, shaft journals and white metal bearing surfaces
  • Check that oil holes, oil ways and spray nozzles are clear
  • Check and record bearing clearances.

The full inspection was completed in just 6 days. The customer was delighted as they could get the unit up and running again, resulting in direct additional revenue to the plant.

Technical Data

Requirement: Full inspection and overhaul of non-Allen unit in limited time scale
Plant: Teesside Power Station
Operator: PX Power
Application: ‘Black start’ gas turbine
Application Type: Gas turbine driven generator - LM6000
Gearbox Type: Lufkin parallel shaft speed decreasing gear
Power: 38,000 kW
Speeds: Input: 3,600 rpm, Output: 3,000 rpm
Allen Gears Services

Request Instalation List For Power Applications

Select Site Work & Scheduled Inspectionns Case Study Allen Gearbox
Non-Allen Gearbox

gearbox enquiry


Download PDF
Click to Download PDF
REQUEST MAINTENANCE SCHEDULE INFORMATION Click here to download PDF REQUEST MAINTENANCE SCHEDULE INFORMATION REQUEST MAINTENANCE SCHEDULE INFORMATION REQUEST MAINTENANCE SCHEDULE INFORMATION REQUEST MAINTENANCE SCHEDULE INFORMATION REQUEST MAINTENANCE SCHEDULE INFORMATION REQUEST MAINTENANCE SCHEDULE INFORMATION

Allen Gears Customers

Allen Gears Customers Alstom hydro
Alstom Power
BP
Centrax Ltd
Clyde Pumps
Doosan
Dresser-Rand
GE
Kawasaki Heavy Industries
KBR
MAN Turbo
ONGC - India
Petrobras
Petrodar
Rolls-Royce
RWE Innogy
Siemens
Solar Turbines Inc
Sulzer Pumps
Turbomach
V A Tech
more




AccreditationsAccreditations
Go To Allen Gears Website
 
 
 
  © Allen Gears Limited 2006. All Rights Reserved
   
Allen Gears Contact an Allen Gears Engineer