Flender Graffenstaden Frame 6 gearbox overhaul
Fellside Heat & Power Station, UK
Project background
Fellside Heat & Power Limited – a wholly owned subsidiary of BNFL – owns the Fellside Station in Cumbria, UK. The gas fired plant generates up to 188MWe, which is sold to the national grid, and since 2002 has been the sole steam supply to Sellafield, making it a critical asset to the operation of BNFL’s business.
In 2005, Wood Group Heavy Industrial Turbines, were awarded a $9 million, six year maintenance contract involving the provision of packaged maintenance services for the three General Electric Frame 6581 gas turbines.
These turbine packages each included a main load speed reducing Flender Graffenstaden parallel shaft gearbox rated at 54MW with an input speed of 5113 rpm and output of 3000 rpm.
The challenge
The gearboxes were installed in 1993, and have not had any routine maintenance performed upon them in this time.
The operator reported a catastrophic failure to Wood Group, who in turn contacted recommended service provider Allen Gears to carry out the investigation work, due to their recent experience.
The outcome
The gearbox was returned to Allen Gears, where a fully strip and inspection was carried out – This confirmed that it was the white metal bearing which had led to damage to the pinion shaft journal.
Whilst carrying out the inspection, Allen Gears also discovered that the pinion shaft had bent as a result of the failure. From the shaft journal to shaft end, there was a bend of 4mm.
The work
Allen Gears rectified the existing pinion by:
- Machining the shaft journal back to fresh metal
- Machining all outboard items including the bore to bring
the shaft back to running true.
- Building the shaft journal back up using metal spray & a new location spigot on the flange
- Carrying out CMM check on the position of the fitted bolt
holes on the mounting flange, then patching and re-boring
holes on the correct PCD.
The method of reclamation ensured that the quill shaft and coupling hub could be reused, saving the end user considerable time and money.
Allen Gears then re-assembled the unit, carrying out the usual checks – clearance, backlash, contact markings. All proved to be excellent, so the unit was shipped back, fully assembled to the customer.
 |
 |
| damaged white metal bearings after gearbox strip |
view of damaged shaft |
 |
 |
| contact mark checks during re-assembly |
final reassembly at AG site |
Returning to site
The unit was re-installed, and Allen Gears were asked to verify the alignment based upon the original specifications, the generator manufacturer carried out the low speed alignment and Allen Gears were again asked to verify this alignment by carrying out calculations based upon the originals specs.
Allen Gears were then asked to witness re-commissioning. They carried out vibration monitoring on the damaged pinion & also from the control system. The unit was run at various stages up to 30 MW and all recordings taken were excellent.
Conclusion
The complete task was completed from start to finish in only 5 weeks. As a result of this, along with our responsiveness and high quality throughout the job, the customer has requested that Allen Gears carry out the inspection and overhaul of the other two units on site.
Technical Data
| Requirement: |
Failure investigation and rectification after failure on site |
| Plant: |
Fellside CHP Plant, Cumbria, UK |
| Operator: |
British Nuclear Group Limited |
| Application: |
GE Frame 6 gas turbine |
| Application Type: |
Gas turbine drive generator – GE Frame 6 |
| Gearbox Type: |
Flender Graffenstaden vertical off-set parallel shaft |
| Power: |
54,000 kW |
| Speeds: |
Input: 5113 rpm. Output: 3000 rpm |
|