Important information for owners of industrial gearboxes
24hr Support

Non-Allen Gearbox
Service & Repair Experience


Alcatel
BHS
David Brown
Flender Graffenstaden
GE
GEC
John Brown
Lufkin
Maag
PGC
Rademaker
Renk
Voith

See Examples >>

Contact an Allen Gears Engineer

 

 
  Home Contact SiteMap News
 
Allen Gears Services
 

SITE WORK AND SCHEDULED INSPECTIONS
Recent Experience Case Study

Allen Gearbox - Maintenance agreements
Tilbury Power Station, UK

Project background

Opened in 1968, Tilbury ‘B’ power station is operated by RWE Innogy in Tilbury Essex. It is a 1400 MW coal-fired power station which feeds into the national grid, meeting the needs of approximately 1.4 million people. It is located on the River Thames in Essex and the generation process is cooled by re-circulating the River Thames water.

For each of four main 500 MW turbines, there is:

  • 1 x motor driven boiler feed pump – this is to control the amount of water being fed to the main boiler
  • 2 x start / stand-by pumps – to aid the start and run down of the main turbines
  • 1 x circulating water pump – to provide critical cooling water.

Each unit has an Allen epicyclic gearbox as follows:

Boiler feed pumps – 680 HP 4750/3082rpm
Start / stand-by pumps – 6,400 HP 1490/4907rpm
Circulating water pump – 2950 HP 165.5/993rpm

Therefore Allen Gears have a total of 16 gearboxes plus 2 spares, installed in the plant. 4 boiler feed pump gearboxes, 8 start/stand-by pump gearboxes and 4 circulating water pump gearboxes.

The challenge

These units were installed in the 1960’s and were overlooked for many years, suffering under-maintenance and neglect.

The customer was looking for a simple maintenance solution - where it was re-assured that the units would run without problems in the future, with guaranteed maintenance costs.


The solution

Allen Gears have set-up a 6 year maintenance contract which includes a fixed price contract for two years.

Allen Gears will return all the boiler feed pump gearboxes and start stand-by units to Allen Gears at intervals agreed with the customer.

AG will – go to site and remove units and send to AG factory

- At AG site we will carry out a full internal inspection
- Including strip, inspection, report and recommendations

Each unit will be inspected every 12 months.

The contract also guarantees fixed prices for all major parts which may be recommended following the inspection.

Technical Data

Requirement: Full on-going predictive maintenance of critical gearboxes
Plant: Tilbury Power Station
Operator: RWE Innogy
Application: Boiler feed pumps and start stand-by pumps
Gearbox Type: Allen Gears epicyclic gearboxes
Allen Gears Services

Request Instalation List For Power Applications

Select Site Work & Scheduled Inspections Case Study Allen Gearbox
Non-Allen Gearbox

gearbox enquiry


Download PDF
Click to Download PDF
REQUEST MAINTENANCE SCHEDULE INFORMATION Click here to download PDF REQUEST MAINTENANCE SCHEDULE INFORMATION REQUEST MAINTENANCE SCHEDULE INFORMATION REQUEST MAINTENANCE SCHEDULE INFORMATION REQUEST MAINTENANCE SCHEDULE INFORMATION REQUEST MAINTENANCE SCHEDULE INFORMATION REQUEST MAINTENANCE SCHEDULE INFORMATION
RoSPA Award for Allen Gears


Go To Allen Gears Website
Accreditations Accreditations
 
 
 
 

Allen Gearing Solutions Limited (registered in England and Wales No.06495417).
Copyright ©2008 - 2017. All Rights Reserved.

Website designed by Lassoo Creative

   
Allen Gears Contact an Allen Gears Engineer